It
mainly consists of three stages, during the first stag all the roof
area is thoroughly washed and cleaned so that no partical of dirt
and dust left on the surface. Then first coat of chemical is paste
on the surface of roof. This is a thin and stricky stuff so that
it joins with the surface perfectly making it a monolithic unit.
Then the second coat pf chemical is applied. It is also in the form
of paste but is a little denser. it cover the first layer making
it a three mm thick layer. Application and costing of this chemical
provides covering to the roof. As this material is bad conductor
of heat and behaves like an insolating material. After this, a chemical
with acyclic base is spread through mechanically operated pump and
sprayed on the surface of second layer which makes a fine and smooth
coating with fine particals. This layer has reflector property and
it can easily reflect back heat waves.
After 4-6 hours interval the process will be complete and the whole
solution will be saturated on the roof and will dry well enough
to give you cool and pleasant atmosphere for work. Now the roof
can safely be used for any purpose. Even parties can be held there.
However ease will have to be taken that no scraches are made on
the surface by arranging on pulling heavy articles with painted
base.
All
right reserved © Copyright WORLD ENTERPRISE 2003
Designed By Zaid Hussain