WORLD ENTERPRISE

 

Home

About Us

Mission Statement

History
Review of Operations

Costing

Process

Contact Us



Process


It mainly consists of three stages, during the first stag all the roof area is thoroughly washed and cleaned so that no partical of dirt and dust left on the surface. Then first coat of chemical is paste on the surface of roof. This is a thin and stricky stuff so that it joins with the surface perfectly making it a monolithic unit. Then the second coat pf chemical is applied. It is also in the form of paste but is a little denser. it cover the first layer making it a three mm thick layer. Application and costing of this chemical provides covering to the roof. As this material is bad conductor of heat and behaves like an insolating material. After this, a chemical with acyclic base is spread through mechanically operated pump and sprayed on the surface of second layer which makes a fine and smooth coating with fine particals. This layer has reflector property and it can easily reflect back heat waves.
After 4-6 hours interval the process will be complete and the whole solution will be saturated on the roof and will dry well enough to give you cool and pleasant atmosphere for work. Now the roof can safely be used for any purpose. Even parties can be held there. However ease will have to be taken that no scraches are made on the surface by arranging on pulling heavy articles with painted base.

 

All right reserved © Copyright WORLD ENTERPRISE 2003
Designed By Zaid Hussain